| | 1 | Conducting Annual Cathodic Protection Surveys |
|
| |
| | 3 | Inspect Cathodic Protection Rectifiers |
|
| | 4 | Cathodic Protection Rectifier Maintenance and Repair |
|
| | 5 | Electrically Inspect Bare Pipe |
|
| | 6 | Prevention of Atmospheric Corrison |
|
| | 7 | Measure Wall Thickness of Pipe |
|
| | 8 | Conducting Cathodic Protection remediation |
|
| | 9 | Monitoring for Internal Corrosion |
|
| | 10 | Inspect buried Pipe when Exposed |
|
| | 11 | Inspect, Test and Calibrate Overfill Protective Devices |
|
| | 12 | Internal Corrosion Remediation |
|
| | 13 | Inspect Internal Pipe Surfaces |
|
| | 14 | Application and Repair of External Coatings |
|
| | 15 | Place and Maintain Line Makers |
|
| | 16 | Inspect Surface Conditions of ROW and Perform Leak surveys for Liquid P/L |
|
| | 16G | Inspect Surface Conditions of ROW and Perform Leak surveys for Gas P/L |
|
| | 17 | Inspect Navigable Waterway Crossings |
|
| | 18 | Inspection of Breakout Tanks |
|
| | 19 | Provide Temporary Marking of Buried P/L Prior to Excavation |
|
| | 20 | Inspection Following Excavation Activities and Leak Survey After Blasting |
|
| | 21 | Provide Security for P/L Facilities |
|
| |
| |
| | 24 | Inspect, Test and Calibrate Relief Valves |
|
| | 25 | Maintain / Repair Relief Valves |
|
| | 26 | Inspect, Test and Calibrate Pressure Limiting Devices |
|
| | 27 | Inspect, Test and Calibrate Pressure Switches and Transmitters |
|
| | 28 | Verify or Set Protection Parameters for Programmable Controllers and/or other Instrumentation Control Loops |
|
| |
| | 30 | Inspect Existing Pipe Following Movement |
|
| | 31 | Measure Clearance from Existing Pipe to Underground Structures Installed by Excavation, Boring, Directional Drilling |
|
| | 32 | Abandoning, Safe Disconnect, Purging, and Sealing of P/L Facilities |
|
| | 33 | Installation, or Replacement / Repair of Support Structures on Existing of New Aboveground Components |
|
| | 34 | Inspection Activities for Tie-Ins, P/L Replacements, or other components Connecting to an Existing P/L |
|
| | 35 | Backfilling a Trench Following Maintenance |
|
| | 36 | Performing General P/L Repair Activities |
|
| |
| | 38 | Maintenance Welding on P/L |
|
| | 39 | Operations of P/L Systems (P/L) |
|
| | 39 | Operations of P/L Systems (E & P Facility) |
|
| | 40 | Computational P/L Monitoring (CPM) Leak Detection |
|
| | 41 | Operate Pressure Relieving Devices for Launching and Receiving Facilities |
|
| | 43 | Flange Bolting Procedures |
|
| | 42 | Performing Maintenance on Valves |
|
| |
| |
| |
| | 50 | Testing an Emergency Shutdown Device |
|
| | 51 | Perform Incremental Pressure Increases to Uprate MAOP |
|
| | 52 | Operate Odorant Equipment |
|
| | 54 | Gas Detection and Alarm System Maintenance and Performance Testing |
|
| | 55 | Isolation of a Gas Compressor Unit |
|
| | 56 | Compressor Station Inspection and Testing of Remote Control Shutdown Devices |
|
| | 57 | Startup, Shutdown and Operations of a Turbine Driven Gas Compressor Unit |
|
| | 58 | Startup, Shutdown and Operation of an Engine Driven Gas Compressor Unit |
|
| | 60 | General Abnormal Conditions |
|
| | 61 | Documentation, Reporting, & OQ Recordkeeping |
|
| | 65 | Damage Prevention During Excavation Activities by or on Behalf of the Operator |
|